Project News

رسم تخطيطي لشبكة الربط والمعلومات وفروعها قبل التطوير
 

E1 Circuits (connected between FRCU and ILN and between ILN and some Sub-sites which constructed outside Shebin El-Kom City).
Data Cables through PSTN ( connected between ILN and some sub-sites which constructed inside Shebin El-Kom City ).
Internal Connection Using UTP Cat.5e Cables (connected between the ILN's Sub-sites and ILN's sub-sub-sites which constructed near the sub-sites distributed at Shebin El-Kom City or Sadat City).

N.B: The full descriptions and details about the current equipments included within the central site, each nodes and branches site mentioned in details in the following page.

Complete Configuration for Current Menoufia University Network before ICTP (ILN and its Branches Distributed at Shebin El-Kom City, Minuf City, Ashmon City, and Sadat City

[1]  [2]  [3]  [4]  [5]  [6]  [7]

5874189