Progress of the Project

-Project Code :IS-UP-10-MNF - Quarter Number: 4 From: 1/11/05 To:31/1/06
-Project Title: ICTP

  1. Monitoring and following the progress of the project plane.
  2. The ministry of communication has finalized the preparation of the Cabinet which included the New main Modem/ Router and the Core Switch at the control Room of ILN Menoufiya University.
  3. Put the direction paths of the Fiber Optical Cable from the ILN to the Main Buildings (Building I and Building II) within the Menoufiya University Main Site Shebin El-Kom.
  4. Determined and finalized the end points (PC Connection to the Internet) within the Main Buildings (Building I and Building II)
  5. Determined and finalized the end points (PC Connection to the Internet) within the new five subnetworks which will establish at Sadat city.

  1. مراقبة ومتابعة تطور العمل حسب الخطة الخاصة بالمشروع.
  2. وزارة الاتصالات انتهت من تجهيز كابينة تحتوي علي المودم/ الموجة ومفتاح التوزيع الرئيسي في حجرة التحكم بالموقع الرئيسي بشبكة الربط والمعلومات, جامعة المنوفية.
  3. الانتهاء من تحديد المسارات الخاصة بكابلات الاوبتكل فايبر ما بين حجرة التحكم بشبكة الربط والمعلومات و المباني الرئيسية (المبني I والمبني II ) بجامعة المنوفية بشبين الكوم.
  4. الانتهاء من تحديد النقاط الخاصة بتوصيل (أجهزة الحاسب بالإنترنت) المباني الرئيسية (المبني I والمبني II ) .
  5. الانتهاء من تحديد النقاط الخاصة بتوصيل (أجهزة الحاسب بالإنترنت) بالشبكات الفرعية الخمس بمدينة السادات.