Progress of the Project

-Project Code :IS-UP-10-MNF - Quarter Number: 5 From: 1/2/06 To:30/4/06
-Project Title: ICTP

  1. Monitoring and following the progress of the project plane.
  2. Finished the connection of ninety nine (99) end points ( i.e. the connection to the Internet) at the main Building (I) and the main Building (II) within the Minufiya University side at Shebin El-Kom and will continue the connection for the remaining twenty one (21) end points (i.e. the connection to the Internet) to reach the total number of one hundred twenty (120) end points.
  3. Finished the connection of eighty (80) end points (i.e. the connection to the Internet ) at the Sadat City side new five sub-networks ( Faculties of (Law, Commerce, Education) Studies and Environmental Research Institute, and General Public Service Center) which will establish at Sadat City.
  4. The awarded company handled most of the items included the contract.
  5. The investigation and checkup the imported items will take place in the first week of May.

  1. مراقبة ومتابعة تطور العمل حسب الخطة الخاصة بالمشروع.
  2. تم الانتهاء من توصيل عدد99 نقطة نهائية لتوصيل خدمة الإنترنت بالمبني الإداري الرئيسي ( I ) وبالمبني الإداري الرئيسي (II ) بجامعة المنوفية- بشبين الكوم ، وسوف يتم استكمال عدد 21 نقطة نهائية لتوصيل خدمة الإنترنت ، ليصبح عدد النقاط النهائية الجديدة بالمبنيين إلي 120 نقطة نهائية.
  3. تم الانتهاء من توصيل عدد 80 نقطة نهائية للخمس شبكات الفرعية الجديدة لكليات (الحقوق والتجارة والتربية) ومعهد الدراسات والبحوث البيئية ومركز الخدمة العامة ) والتي سوف يتم إنشائها بمدينة السادات .
  4. الشركة المنوطة بتوريد أجهزة التطوير وردت معظم الأصناف المتعاقد عليها.
  5. الفحص المبدئي للأصناف الموردة سوف يتم البدء فيه في الأسبوع الأول من مايو 2006 .